Business news from Ukraine

Business news from Ukraine

Sukha Balka has commissioned new ore block at Yuvileina mine

21 November , 2025  

The Sukha Balka mine (Kryvyi Rih, Dnipropetrovsk region), part of Alexander Yaroslavsky’s DCH group, is commissioning a new iron ore deposit block, Golovnyi, at the Yuvileina mine.

According to a report in the DCH Steel corporate newspaper on Thursday, preparations for the new production capacity at the mine have been completed.

It is specified that in early November, a specialized commission consisting of leading specialists of the enterprise and representatives of the State Labor Service of Ukraine signed an act on the commissioning of mining block 13-17. It is located in the Golovnoy deposit at a depth of 1,420 meters, sub-level 3A.

The block’s projected reserves amount to 221,300 tons of ore with an iron content of 60.75%.

“This is a large block that we have been preparing for production for almost a year, and its reserves will be enough for six months of stable operation of the enterprise,” said Mykola Puntus, chief engineer of the Yuvileina mine.

It is also reported that at the Tsentralna mine, the drainage pond at the -1260 m and -1340 m levels has been repaired. The diameter of the new pipeline between these underground levels is 325 mm. The Tsentralna mine is part of the Yuvileina mine. A drainage pond is a hydraulic engineering structure designed to collect water and is a critical part of the mine drainage system.

The Sukha Balka mine is one of the leading enterprises in the mining industry in Ukraine. It extracts iron ore using underground mining methods. The mine includes the Yuvileina and Frunze mines.

The DCH Group acquired the mine from the Evraz Group in May 2017.

, , , ,