Gazprom did not choose the capacity of the Polish section of the Yamal-Europe gas pipeline during the gas transmission capacity booking session for May, according to auction data on the GSA Platform booking platform.
89 million cubic meters were offered at the auction. m per day – all these capacities were not booked.
The Yamal-Europe gas pipeline, over 2,000 km long, can pump up to 33 billion cubic meters. m per year. The Polish 683 km section is owned by the EuRoPol Gaz joint venture and operated by the national gas transmission operator Gaz-System.
Gazprom’s long-term contract for transit through this country ended two years ago. Since then, its capacity has been allocated based on auction bookings.
At present Gazprom does not use the capacities of Yamal-Europe for deliveries to Germany. The pipeline transports Russian gas to Poland. Also, through it, the republic receives small volumes of this energy resource from Germany in reverse.
The gas transmission system operator of Ukraine did not offer additional capacities for the transit of Russian gas. In previous months, a solid capacity of 15 million cubic meters was set. m per day with the entrance through the gas measuring stations (GIS) “Sudzha” and “Sokhranovka”. For several months in a row, Gazprom did not book these capacities at auctions.
The Russian concern has a long-term reservation of Ukrainian capacities in the amount of 40 billion cubic meters. m is 109 million cubic meters. m per day.