InVenture reports on the sale of Raikivskyi granite quarry1 and crushed stone plant. The portal writes that the business operates stably and permanently, is equipped with high-quality machinery and equipment, and the well-coordinated work of the team ensures quality and uninterrupted operation. The company used the facility for its own construction needs.
Location: Zhytomyr region, Berdychiv district, the village of Rayky.
Raiky crushed stone plant is located 40 minutes from the regional center, Zhytomyr. It has a convenient infrastructure, making it easy to transport materials. A railway station is located nearby, which significantly expands the routes and volumes of raw materials supply. There are also access roads – an asphalt and a gravel road.
Raikivskyi Granite Quarry LLC extracts granite at the Raikivske deposit (site No. 2) on the basis of a special subsoil use permit No. 5856 (valid until 2033, not suspended).
The neighboring site “Quarry No. 1” Raikivske field was previously developed by the State Enterprise of the State Criminal Executive Service of Ukraine (SECSU) No. 73 (special permit No. 4074 has been terminated).
The total area of the facility is 4.5280 hectares, and the approved reserve of raw materials for extraction is more than 10 million tons, with approximately 10 million tons of unconfirmed reserves.
The company has a license for official mining and processing of rock mass.
Its main products are crushed stone, rubble stone, and crushed stone and sand mixture.
The quarry has its own fleet of vehicles used for the extraction and transportation of raw materials. There are such special vehicles as MAN, MAZ, KAMAZ, DAF, SCHMITZ.
There are special rooms for changing personnel, a room for electrical equipment and a control panel, and a security room.
The entire territory of the facility is guarded and video surveillance is carried out throughout the quarry.
The plant has all the equipment necessary for the extraction of raw materials, crushing them into fractions, transportation and weighing, such as
Staff: 30 employees
Fractions: 0.05-20 mm, 0.05-40 mm (C-7), 0.05-70 mm (C-5).