Montreal House, Kyiv (102 V. Vasylkivska St. / 83 Antonovycha St.)

– Block 1: installation of water and heat supply pipelines has reached 85%, cement screed on the residential floors and in common areas, electrical work is also underway – 30% of readiness.

– Block 2: similar works – pipelines are at 95%, screeding and general works are in progress, electrical installation is at 30%.

– Block 3: installation of aluminum subsystem for translucent structures is underway, the laying of electrical cables to the apartments is completed.

– Block 4: installation of translucent constructions continues (40% complete), cabling of apartments is in progress.

Parking lot (at Montreal House)

– Waterproofing of the top slab is 60% complete, installation of rainwater drainage pipes is in progress.

– Works on connection to water supply and sewage networks are in progress: domestic sewage – 80%, connection to water supply – 70%.

Krona Park II, Brovary (32 Simonenka str.)

– House 3: the certificate of commissioning has been received.

– House 5: internal water supply and sewerage networks are being installed, ground is being laid, basement walls are being insulated, roof construction and window installation are underway (floors 2-5 are ready, works have started on floors 6-7).

– House 8: installation of electrical networks, elevators, facade (section 1 – 75%, section 2 – work has begun).

– Building 9: commissioning works, finishing, landscaping of the adjacent territory.

– House 10: the facade is being completed (95% completed), cold doors are being installed, plumbing and electrical works are in progress.

– House 12: roofing works on sections 1 and 2 continue, installation of PVC windows has started.

– Houses 14 and 16: boroinjection paleo field is completed – 100%.

“Forest Quarter”, Brovary (16, V. Chornovol str.)

– Concrete pouring of the foundation slab of section 1 is completed, preparation of the growth beam of section 2.1 and installation of vertical monolithic structures in section 2.2 is in progress.

Alliance Novobud is a Ukrainian development company operating in the residential and commercial real estate market for more than 18 years. It was founded in the mid-2000s. The headquarters is located in Kiev. The main activity is construction of high-rise residential complexes of comfort and business class, as well as related social and commercial infrastructure.

The company is among the top 20 developers of Kyiv and Kyiv region by the amount of commissioned housing (according to Anbud and LUN profile portals). The total volume of completed projects is estimated at more than 800 thousand sq. m. of housing. At the stage of construction and preparation – about 300 thousand sq. m. more.

Alliance Novobud positions itself as a developer focused on quality and compliance with deadlines. The company regularly publishes reports on construction dynamics, which increases transparency and trust.

In the period 2022-2025, despite the war and economic difficulties, the company continued active construction, which sets it apart from its competitors.

The company’s strategy involves the development of mixed residential neighborhoods with the integration of schools, kindergartens, retail space and recreational areas.

https://interfax.com.ua/news/press-release/1101400.html

 

,