Business news from Ukraine

Business news from Ukraine

STATE-OWNED ENERGOATOM AND UKRENERGO COMPLETE NEXT STAGE OF PREPARATION FOR SYNCHRONIZATION OF UKRAINE’S ENERGY SYSTEM WITH ENTSO-E

15 October , 2020  

After tests at power unit No. 3 of Yuzhnoukrainsk nuclear power plant (NPP), the program for testing excitation systems of turbine generators of power units of Ukrainian NPPs, included in the catalog of measures of the agreement on the terms of future integration of the united energy system of Ukraine with the European Network of Transmission System Operators for Electricity ENTSO-E, has been successfully completed.
According to the website of Energoatom, in addition to specialists of Energoatom and Ukrenergo, representatives of the ENTSO-E Consortium and DMSS-Engineering with the support of the USAID Energy Security Project took part in testing the excitation systems of turbine generators.
The company recalled that Energoatom began this program on August 17, 2020 together with Ukrenergo as part of checking the compliance of the domestic generation with the ENTSO-E technological standards. Corresponding tests were carried out at power unit No. 2 of Rivne NPP, No. 1 of Zaporizhia NPP, as well as power units No. 1 and No. 3 of Yuzhnoukrainsk NPP.
According to Energoatom, on the basis of research data, the ENTSO-E Transmission System Operators Consortium (EMC, MAVIR, PSE, SEPS, 50Hertz and Transelectrica) will create a common mathematical model of the synchronous operation of the Ukrainian and European power systems. Also, this information will be used to study the static and dynamic stability of the united energy system of Ukraine, provided that it works in parallel with ENTSO-E.
Energoatom noted that Ukrenergo signed a service contract for the implementation of this item in the catalog of events with the CONSORTIUM in 2019.
At the same time, commenting on the completion of the tests, the Ministry of Energy noted on the website that in addition to the planned technical measures, in order to successfully complete the synchronization, it is necessary to certify the transmission system operator in accordance with the requirements of the Third Energy Package of the EU.

, , , ,