The construction of a new aerodrome of the international airport in Dnipropetrovsk region will begin in the summer of 2020. The press service of Dnipropetrovsk Regional State Administration said, with reference to head of the administration Oleksandr Bondarenko, a designer is now being selected, he will be known in December 2019. In May 2020, a general contractor will be determined. According to the project, which Bondarenko presented to Speaker of the Verkhovna Rada Dmytro Razumkov, the airport will have a runway that can accept all types of aircraft, and a modern terminal. It is planned that its throughput will reach 3 million people a year.
“Dnipro for many years has been without an air artery that could show the city’s capabilities. We must pay tribute to MPs who chose Dnipro and the region. They made every effort to talk about the implementation of the project today. I hope that in the spring of 2022 the airport will be able to accept modern large aircraft that will provide both economic and tourist growth,” Razumkov said.
Dnipropetrovsk Regional State Administration noted that the regional state administration and a private investor will work on the project simultaneously. A runway will be built for state funds: UAH 1 billion was stipulated in the 2020 national budget for this purpose. It will be 3.2 km long and will have modern navigation systems, meteorological and lighting equipment.
The total project cost is $180 million.